As part of a new development in Greenpoint, TMS Waterfront was contracted to upgrade the waterfront. The project included demolition of a derelict timber and concrete pier, removal of heavy debris on the shoreline, and grading of the site to required flood grades and shoreline design.

TMS Waterfront then installed concrete encased H-Piles with precast caps, planks and CIP deck elements for a waterfront access pier. This included a decorative deck with hand set pavers, minor planters and furniture, decorative lighting fixtures and railings. In addition, TMS Waterfront fabricated a steel barge ferry landing and installed it for NYCEDC ferry service at the end of the pier.

From land, TMS Waterfront then installed a riprap revetment for shoreline stabilization, pedestrian ramps for ADA access, security gates and fencing and a complete electrical service.

The project was a combination of our land based equipment and waterfront construction expertise. All elements were installed in accordance with NYCDPR specifications and approved by the NYCEDC at the completion of the project.

Owner

Stiles Property - NYCEDC

Role

Prime Contractor

Services

Concrete
Marine Construction
Site Work
Pile Driving
Structural Steel
Ornamental Metal
Site Finishes

Contract term

2011

More Projects

View All Projects

Next Project

View Tango Pier