About the project
TMS is providing demolition and reconstruction design for Tango Pier on Governors Island. Tango Pier is a T-shaped pier located on the southeast shoreline of Governors Island, extending approximately 225 feet into Buttermilk Channel. The stem of the pier measures approximately 20’-6” wide by 195 feet long. The pier’s T-head measures approximately 30 feet wide by 500 feet long.
Key parts of the contract include:
- Pier designed to NYCDOB, SBS, and Appendix G standards for code and resiliency purposes.
- Pier is to support ferry berthing
- The designs shall provide for utilities in the pier and future expansion of the same.
- Demolition and reconstruction of the pier will require close coordination with the Audubon Society to protect the Common Tern, a protected species, that use the pier as a nesting site, and the USACE/USCG and NYSDEC for other environmental regulations within NY Harbor.
Subconsultant team members include: Buckman Engineering PLLC, Indigo River Consulting LLC, Control Point Associates, PG Environmental, and Skyline Engineering.
Owner
Governor's Island
Role
Flood Mitigation
Resiliency
Services
Flood & Resiliency Code and Risk Analysis for Permitting and Design
Cost Estimating
Contract term